""Dust Chamber  
 

Construction :
The construction of the Chamber will be such to avoid direct radiation of heat on the test specimen. The floor of the chamber will be so designed as to permit the dust fall in to the hopper for recirculation of supporting specified load of the floor area.
Exterior Chamber : Will be made of 18 swg CRC M. S. Sheet with 3 coats of paint
or
18 swg Stainless Steel
Interior Chamber : Made of 18 swg Stainless Steel
Heating System :
For temperature uniformity in the chamber, low surface loading sealed tubular heaters will be provided as per IS 4159. The heaters will be fixed in conditioning space in the chamber duly baffled to avoid direct radiation.

Heat Input Controlling : Through Solid State Triac Firing Energy Regulator will control with 0 to 100 % proportional control for heating.

Dust Agitating Mechanism
  • Dust Agitating Mechanism will be provided with Fan with Motor of sufficient capacity without allowing to heat up unduly during constant operation of 200 hours.
  • Pressure Vacuum will be provided in the Dust Spray Chamber.
  • Provision of using, either fan or vacuum or both can be used at a time, will be provided.
  • Average dust sprayed will be 25 gms ±5 gms in 5 minutes.
Instrumentation
Solid State Digital Temperature Controller-cum-Indicator will be provided with PT-100 Temperature Thermocouple.

Control Panel
Separate Control Panel on top of the Chamber will be provided with Contactors, On/Off Switches, Fuses, and Indicating Lamps.

Wiring
The wiring, will be channel type with suitable current rated copper wire as per, IS Code.


Safety Protection

  • Overload Protector for motor.
  • MCB for heaters.
  • Safety cut off thermostat with audiovisual alarm for over shooting temperature.
  • Back up Fuse protection for mains and individual circuit.
Other specifications
Temp. Range : Amb. +5°C to 80°C 1°C (OR As per Customer's Requirement)
Gradient in Space : Less than 1.5°C
Insulation : 75 mm Thick Glass Wool Insulation
Door : Double walled full front opening door, insulated with interior Stainless Steel lining.
Gasket : To avoid leakproofing, the chamber will be provided with gaskets for the Chamber and for the Door.
Mounting Trolley : Mounting Type Trolley with Casters for Portability will be provided.
Hinges & Latches : Heavy duty Hinges with Toggle Type Locking Arrangement.
Power Supply : 220/415 V, Single/Three Phase Neutral, 15/30 amp.
Size : 0.8 cubic meter-As per Standard (OR As per Customer's Requirement)
     
Standards : JIS-D 0207, IS-9000 Part XII-1981 or both can be combined
  • Pressure Vacuum will be provided in the Dust Spray Chamber.
  • Provision of using, either Fan or Vacuum or Both can be used at a time, will be provided.